Modern data centers are very different than those
of the past. Main Frame data processing
systems have evolved into Enterprise
Network, Client/Server, and Storage Area Network
systems. Reliance on data center
applications has risen to new levels where down
time -- planned and unplanned - has become
either intolerable or prohibitively expensive.
The changes in processing equipment and configurations
have resulted in corresponding changes in the demands
placed upon the support systems that serve them.
While the modern equipment is much more efficient
from the standpoint of energy consumption and heat
rejection, the tremendous miniaturization as well
as the demand for additional services in recent
years now allows many more devices to be installed
in a given space. This often results in an overall
increase in the required electrical and cooling
capacity. Likewise, the configurations of the electrical
and cooling systems must support the increased equipment
density. In many spaces, traditional raised computer
flooring is also giving way to overhead cooling,
electrical circuiting, and data cable routing thereby
reducing construction and long term maintenance
costs.
The planning and design of mission-critical data
processing installations require specialized expertise
to address such issues as the physical arrangement
of the data processing equipment, circulation through
the space, the level of electrical and mechanical
support system backup and redundancy that is appropriate
for the facility's mission, and the coordination
of the support systems with the architectural and
structural elements of the building. JanCom Technologies
possesses the resources to create and manage a formidable
team of professionals capable of providing Architectural,
Mechanical, and Electrical design. JanCom's
emphasis is always focused on the computing system
User, the computing system, maintenance and manageability
of the space, and the importance of the installed
system's uninterrupted operation.
JanCom Technologies, Inc. Provides
--